Ikeja HQ Lekki Island OfficeInstalling in 12+ states
Our work

Proof, installed.

From single homes to industrial plants, every Forra system is engineered, installed and monitored — and still running. A look at what clean, reliable power has done across Nigeria.

  • 380+ projects delivered
  • 12+ states covered
  • Every system monitored
  • Real, measured outcomes
0.0 MWInstalled capacity
0+Projects completed
0.0 GWhGenerated / year
0 tCO₂ offset / year
Case studies

Filter by sector.

9 projects

120 kW
Lekki Phase 1, Lagos·Residential estate

Diesel eliminated across the estate; service charge down 31%.

120 kW
38 homes
168 MWh/yr
Residential
65 kW + 120 kWh
Ikeja, Lagos·Medical centre

Zero outage minutes in theatres since commissioning.

65 kW + 120 kWh
Medical centre
94 MWh/yr
Healthcare
250 kW
Abeokuta, Ogun·Rice mill

Processing costs down 44%; night-shift capacity added.

250 kW
Agro-processing
372 MWh/yr
Agriculture
90 kW + 80 kWh
Enugu·Secondary school

Prep and boarding lit every night; diesel budget redirected to staff.

90 kW + 80 kWh
Boarding school
132 MWh/yr
Education
300 kW
Victoria Island, Lagos·Office complex

Peak grid demand cut by half; fully monitored across meters.

300 kW
Office complex
440 MWh/yr
Commercial
140 kW + 200 kWh
Ibadan, Oyo·Hotel

Seamless guest experience; the generator has been retired.

140 kW + 200 kWh
120-room hotel
205 MWh/yr
Hospitality
500 kW
Kano·Bottling plant

Line uptime protected; energy cost per unit down 38%.

500 kW
Industrial plant
740 MWh/yr
Manufacturing
15 kVA ×4
Port Harcourt, Rivers·Retail chain

Every branch trades full hours on solar; diesel spend gone.

15 kVA ×4
Retail outlets
88 MWh/yr
SME
60 kW
Kaduna·Poultry farm

Cold storage secured and ventilation reliable — fully off-grid.

60 kW
Off-grid farm
88 MWh/yr
Agriculture

Your project could be next.

Start with a free audit — we'll size the right system for your home, business or facility and show you the numbers.

Run a free audit