A Lagos office complex halved its expensive peak-hour grid demand and put every meter under monitoring.

300 kWSystem
440 MWh/yrGeneration
−50%Peak demand
AllMeters monitored

The challenge

Peak-hour grid tariffs and diesel backup made energy one of the building's largest and least predictable costs.

What we built

A 300kW three-phase solar and storage system that shaves peak demand and covers critical loads, with facility-wide monitoring.

The results

  • Peak grid demand cut by half
  • Energy costs down and fully visible
  • Critical systems backed up through outages

Our energy costs are down and, for the first time, completely visible.

Ngozi UmehFacilities Director · Lagos

Your results could be next.

Start with a free audit — we'll size the right system and show you the outcome you can expect.