A Lagos office complex halved its expensive peak-hour grid demand and put every meter under monitoring.
300 kWSystem
440 MWh/yrGeneration
−50%Peak demand
AllMeters monitored
The challenge
Peak-hour grid tariffs and diesel backup made energy one of the building's largest and least predictable costs.
What we built
A 300kW three-phase solar and storage system that shaves peak demand and covers critical loads, with facility-wide monitoring.
The results
- Peak grid demand cut by half
- Energy costs down and fully visible
- Critical systems backed up through outages
“Our energy costs are down and, for the first time, completely visible.”
Your results could be next.
Start with a free audit — we'll size the right system and show you the outcome you can expect.