A bottling plant protected its line uptime and cut energy cost per unit by nearly 40%.
500 kWSystem
740 MWh/yrGeneration
−38%Cost per unit
ProtectedUptime
The challenge
A single outage could ruin a batch and cost hours restarting the line, while diesel made every bottle more expensive to produce.
What we built
A 500kW three-phase solar and storage system engineered for the plant's motor loads, bridging outages instantly.
The results
- Line uptime protected through outages
- Energy cost per unit down 38%
- Diesel hours sharply reduced
“A single outage used to ruin a batch. Now the line runs straight through.”
Your results could be next.
Start with a free audit — we'll size the right system and show you the outcome you can expect.