A bottling plant protected its line uptime and cut energy cost per unit by nearly 40%.

500 kWSystem
740 MWh/yrGeneration
−38%Cost per unit
ProtectedUptime

The challenge

A single outage could ruin a batch and cost hours restarting the line, while diesel made every bottle more expensive to produce.

What we built

A 500kW three-phase solar and storage system engineered for the plant's motor loads, bridging outages instantly.

The results

  • Line uptime protected through outages
  • Energy cost per unit down 38%
  • Diesel hours sharply reduced

A single outage used to ruin a batch. Now the line runs straight through.

Ibrahim DanjumaPlant Manager · Kano